- Cloitre
vue 189 fois - Construction detail 1
vue 149 fois - Construction detail 2
vue 140 foisStructure jonction and water outlet
- Daylight Simulations 1a
vue 133 fois - Daylight Simulations 1b
vue 138 fois - Daylight Simulations 2a
vue 133 fois - Daylight Simulations 2b
vue 122 fois - Daylight Simulations 3
vue 131 foisDimensioning of the wood cladding:
First row: Wooden batten of 20 cm and 20cm spacing
Second row: Wooden batten of 10 cm and 20cm spacing
Third row: Wooden batten of 10 cm and 10cm spacing
- Ecology
vue 229 foisThe site analysis allowed to identify the canal's flood zone. The project implemented a lagooning as water treatment and storage system in this zone. After green zone analysis, it was also decided to ensure its continuity between Laeken'parc and the agricultural areas on East's side.
- Economy/Living
vue 148 foisThe project promoted circular economy by creating waste management's zones near the production industries. The site has been densified by adding houses and other construction related to the living (education, leisure, work, etc) in the brownfield sites.
- Indoor view
vue 133 fois - Main facade
vue 152 fois - Main Section
vue 127 fois - Mobility
vue 129 foisThe traffic has been reduced in the upper part of the site to improve pedestrian accessability by moving the heavy industry to the right bank of the canal (lower part of the site).
- Model 1
vue 146 fois - Model 2
vue 162 fois - Model 3
vue 139 fois - P1160122
vue 216 fois - P1200582bis
vue 107 fois - PhotoCover2
vue 108 fois - Plan de coffrage
vue 141 fois - Plan de coffrage - ferraillage
vue 178 fois - Planss
vue 159 fois - Principal section
vue 122 fois - Principal Section
vue 139 fois - Project ayonometry
vue 153 fois - Rear facade
vue 137 fois - sculpture
vue 163 fois - Section 1
vue 249 fois - Section 2
vue 172 fois