- Inside View
333 hits - Brewery and housing
327 hitsRenovation of the old Marly brewery, which was hided behind industries. Those industries were moved to recover the brewery's 20th century industrial architecture. Shops and convenience stores are added near the houses. The road to access the brewery is separated to the house's yards by a level difference.
- DSC02115
309 hits - DSC02108
270 hits - Section 1
254 hits - View 2
254 hits
View of the cafetaria - Intention drawing
239 hits - Ecology
230 hitsThe site analysis allowed to identify the canal's flood zone. The project implemented a lagooning as water treatment and storage system in this zone. After green zone analysis, it was also decided to ensure its continuity between Laeken'parc and the agricultural areas on East's side.
- View 1
225 hits
View of the entrance hall - View 3
219 hits
View of the building - Architectural model 1
207 hits - DSC02035
191 hits - DSC02049
186 hits - Architectural model 2
181 hits - DSC02034
179 hits - Plan de coffrage - ferraillage
179 hits - Architectural model
178 hits - DSC020832
177 hits - Section 2
177 hits - Urbanism plan
176 hitsArea's developments :
1. Two circulation types: slow rate (perpendicular to the canal, for pedestrian and cyclists, to link several neighbourhood institution to the canal) and fast rate (parallel to the canal, linking the neighbourhood to Brussel's center)
2. Adding of attractive places at the intersection between the slow rate roads and the canal.
3. Playing level to enable the densification and alternate between housing, industry, offices and other institutions.
4. Installation of a grid to unite all the canal's installations and to give an identity to the area. Creation of places near the attractive places with mineral coating. - DSC020933
175 hits - IMG 48002
175 hits - DSC02033
174 hits - DSC02112
174 hits - DSC020902
172 hits - IMG 4791
172 hits - DSC020822
170 hits - DSC02011
168 hits - IMG 4795
168 hits - Coupe
166 hits