- Model 1
vue 151 fois - Jury
vue 161 fois - Laboratory test 2
vue 145 fois - Laboratory test 1
vue 159 fois - Main Section
vue 131 fois - Daylight Simulations 2b
vue 128 fois - Daylight Simulations 2a
vue 139 fois - Daylight Simulations 1b
vue 144 fois - Daylight Simulations 1a
vue 138 fois - Daylight Simulations 3
vue 136 foisDimensioning of the wood cladding:
First row: Wooden batten of 20 cm and 20cm spacing
Second row: Wooden batten of 10 cm and 20cm spacing
Third row: Wooden batten of 10 cm and 10cm spacing
- Coupe
vue 170 fois - PlanMasse
vue 160 fois - planbatiments
vue 162 fois - Planaquarelle
vue 167 fois - CHI 6106
vue 170 fois - Perspective
vue 166 fois - Intention plan
vue 155 fois - Perspective
vue 160 fois - Rear facade
vue 141 fois - Main facade
vue 156 fois - Indoor view
vue 137 fois - Model 3
vue 144 fois - Brewery and housing
vue 333 foisRenovation of the old Marly brewery, which was hided behind industries. Those industries were moved to recover the brewery's 20th century industrial architecture. Shops and convenience stores are added near the houses. The road to access the brewery is separated to the house's yards by a level difference.
- School and marketplace
vue 167 foisA new primary school is implemented near the canal, keeping the silo's shape of the preceding industries. A market and a leisure center are also added at the end of a road coming from the neighbourhood.
- Mobility
vue 133 foisThe traffic has been reduced in the upper part of the site to improve pedestrian accessability by moving the heavy industry to the right bank of the canal (lower part of the site).
- Economy/Living
vue 155 foisThe project promoted circular economy by creating waste management's zones near the production industries. The site has been densified by adding houses and other construction related to the living (education, leisure, work, etc) in the brownfield sites.
- Ecology
vue 236 foisThe site analysis allowed to identify the canal's flood zone. The project implemented a lagooning as water treatment and storage system in this zone. After green zone analysis, it was also decided to ensure its continuity between Laeken'parc and the agricultural areas on East's side.
- Architectural model
vue 186 fois - Brewery and housing
vue 163 fois - Urbanism plan
vue 180 foisArea's developments :
1. Two circulation types: slow rate (perpendicular to the canal, for pedestrian and cyclists, to link several neighbourhood institution to the canal) and fast rate (parallel to the canal, linking the neighbourhood to Brussel's center)
2. Adding of attractive places at the intersection between the slow rate roads and the canal.
3. Playing level to enable the densification and alternate between housing, industry, offices and other institutions.
4. Installation of a grid to unite all the canal's installations and to give an identity to the area. Creation of places near the attractive places with mineral coating.