- Dimensioni delle fotoQuadrata
Miniatura
XXS - minuscola
XS - piccolissima
S - piccola
✔ M - Media
L - Grande
Home 110
Data d'invio / 2019 / Novembre
- Cloitre
viste 189 - Construction detail 1
viste 149 - Construction detail 2
viste 141Structure jonction and water outlet
- Daylight Simulations 1a
viste 133 - Daylight Simulations 1b
viste 138 - Daylight Simulations 2a
viste 133 - Daylight Simulations 2b
viste 122 - Daylight Simulations 3
viste 131Dimensioning of the wood cladding:
First row: Wooden batten of 20 cm and 20cm spacing
Second row: Wooden batten of 10 cm and 20cm spacing
Third row: Wooden batten of 10 cm and 10cm spacing
- Ecology
viste 229The site analysis allowed to identify the canal's flood zone. The project implemented a lagooning as water treatment and storage system in this zone. After green zone analysis, it was also decided to ensure its continuity between Laeken'parc and the agricultural areas on East's side.
- Economy/Living
viste 148The project promoted circular economy by creating waste management's zones near the production industries. The site has been densified by adding houses and other construction related to the living (education, leisure, work, etc) in the brownfield sites.
- Indoor view
viste 133 - Main facade
viste 152 - Main Section
viste 127 - Mobility
viste 129The traffic has been reduced in the upper part of the site to improve pedestrian accessability by moving the heavy industry to the right bank of the canal (lower part of the site).
- Model 1
viste 146 - Model 2
viste 162 - Model 3
viste 139 - P1160122
viste 216 - PhotoCover2
viste 108 - Plan de coffrage
viste 141 - Plan de coffrage - ferraillage
viste 178 - Planss
viste 160 - Principal section
viste 122 - Principal Section
viste 139 - Project ayonometry
viste 153 - Rear facade
viste 137 - sculpture
viste 165 - Section 1
viste 250 - Section 2
viste 172 - Section 3
viste 143