- Dimensioni delle fotoQuadrata
Miniatura
XXS - minuscola
XS - piccolissima
S - piccola
M - Media
✔ L - Grande
Home 110
Data d'invio / 2019 / Novembre
- School and marketplace
viste 161A new primary school is implemented near the canal, keeping the silo's shape of the preceding industries. A market and a leisure center are also added at the end of a road coming from the neighbourhood.
- CHI 6106
viste 162 - Model 2
viste 162 - Coupe
viste 163 - DSC020822
viste 163 - sculpture
viste 163 - DSC020902
viste 165 - DSC020832
viste 168 - DSC020933
viste 168 - IMG 48002
viste 168 - Section 2
viste 171 - Urbanism plan
viste 174Area's developments :
1. Two circulation types: slow rate (perpendicular to the canal, for pedestrian and cyclists, to link several neighbourhood institution to the canal) and fast rate (parallel to the canal, linking the neighbourhood to Brussel's center)
2. Adding of attractive places at the intersection between the slow rate roads and the canal.
3. Playing level to enable the densification and alternate between housing, industry, offices and other institutions.
4. Installation of a grid to unite all the canal's installations and to give an identity to the area. Creation of places near the attractive places with mineral coating. - Architectural model
viste 176 - Plan de coffrage - ferraillage
viste 178 - StBrieuc2
viste 185 - Cloitre
viste 189 - StBrieuc1
viste 192 - P1160122
viste 215 - View 3
viste 219
View of the building - View 1
viste 224
View of the entrance hall - P1170167
viste 227 - Ecology
viste 229The site analysis allowed to identify the canal's flood zone. The project implemented a lagooning as water treatment and storage system in this zone. After green zone analysis, it was also decided to ensure its continuity between Laeken'parc and the agricultural areas on East's side.
- Intention drawing
viste 236 - P1180103
viste 238 - P1170977
viste 239 - P1170318
viste 244 - P1160188
viste 245 - P1170988
viste 249 - Section 1
viste 249 - P1150673
viste 252