- Dimensioni delle fotoQuadrata
Miniatura
XXS - minuscola
XS - piccolissima
S - piccola
✔ M - Media
L - Grande
Home / University's projects 75
Data d'invio
- Model 3
viste 144 - Model 2
viste 167 - Model 1
viste 151 - Mobility
viste 133The traffic has been reduced in the upper part of the site to improve pedestrian accessability by moving the heavy industry to the right bank of the canal (lower part of the site).
- Main Section
viste 131 - Main facade
viste 156 - Layout Plan
viste 155 - Laboratory test 2
viste 145 - Laboratory test 1
viste 159 - Jury
viste 161 - Intention plan
viste 155 - Intention drawing
viste 245 - Inside View
viste 341 - Indoor view
viste 137 - IMG 48002
viste 178 - IMG 4795
viste 171 - IMG 4791
viste 173 - Economy/Living
viste 155The project promoted circular economy by creating waste management's zones near the production industries. The site has been densified by adding houses and other construction related to the living (education, leisure, work, etc) in the brownfield sites.
- Ecology
viste 236The site analysis allowed to identify the canal's flood zone. The project implemented a lagooning as water treatment and storage system in this zone. After green zone analysis, it was also decided to ensure its continuity between Laeken'parc and the agricultural areas on East's side.
- DSC02115
viste 314 - DSC02112
viste 174 - DSC02108
viste 273 - DSC020933
viste 181 - DSC020902
viste 176 - DSC020832
viste 183 - DSC020822
viste 173 - DSC02049
viste 187 - DSC02035
viste 193 - DSC02034
viste 179 - DSC02033
viste 175