- Dimensioni delle fotoQuadrata
Miniatura
XXS - minuscola
XS - piccolissima
S - piccola
M - Media
✔ L - Grande
Home / Risultato della ricerca 75
- Construction detail 1
viste 155 - Construction detail 2
viste 149Structure jonction and water outlet
- Daylight Simulations 1a
viste 138 - Daylight Simulations 1b
viste 144 - Daylight Simulations 2a
viste 139 - Daylight Simulations 2b
viste 128 - Daylight Simulations 3
viste 136Dimensioning of the wood cladding:
First row: Wooden batten of 20 cm and 20cm spacing
Second row: Wooden batten of 10 cm and 20cm spacing
Third row: Wooden batten of 10 cm and 10cm spacing
- Ecology
viste 236The site analysis allowed to identify the canal's flood zone. The project implemented a lagooning as water treatment and storage system in this zone. After green zone analysis, it was also decided to ensure its continuity between Laeken'parc and the agricultural areas on East's side.
- Economy/Living
viste 155The project promoted circular economy by creating waste management's zones near the production industries. The site has been densified by adding houses and other construction related to the living (education, leisure, work, etc) in the brownfield sites.
- Indoor view
viste 137 - Main facade
viste 156 - Main Section
viste 131 - Mobility
viste 133The traffic has been reduced in the upper part of the site to improve pedestrian accessability by moving the heavy industry to the right bank of the canal (lower part of the site).
- Model 1
viste 151 - Model 2
viste 167 - Model 3
viste 144 - PhotoCover2
viste 108 - Plan de coffrage
viste 146 - Plan de coffrage - ferraillage
viste 183 - Planss
viste 165 - Principal section
viste 127 - Principal Section
viste 145 - Project ayonometry
viste 160 - Rear facade
viste 141 - Section 1
viste 256 - Section 2
viste 178 - Section 3
viste 148 - Urbanistic section
viste 162 - View 1
viste 230
View of the entrance hall - View 2
viste 258
View of the cafetaria